In a temporary joint venture with Comsa Medio Ambiente, Abantia is constructing a plant for the treatment and reduction of excess slurry from the farms of the area in Miralcamp (Lerida), with a treatment capacity of 110,000 Tn/year and a continuous operation system of 8,150 hours a year.
The Valpuren© process consists in purifying and stabilising slurry by means of anaerobic digestion, followed by its physical and chemical treatment by means of the mechanical and thermal concentration of the spent slurry, obtaining a solid organic and mineral end product that can be used as base fertiliser. The plant will come online in March 2009.

 

Linkedin

  • Investment

    €22.5 M


Site information

Contact with us

Torre Allianz

Headquarters

Barcelona

C/ Asturies, 8 - 10 · 08830 Sant Boi de Llobregat · Situation map
Tel. 935 521 400

Madrid

C/ Castelló, 23 · 28001 Madrid · Situation map
Tel. 917 819 170

© Abantia 2008 - 2012 · All rights reserved