Major projects
Construction of a Morphylane plant (the name of a process for obtaining aromatic compounds).
The plant extracts the aromatic compounds (benzene, toluene, etc.) that form in the reforming units to use them as a raw material in the petrochemical industry.
Assembly of 60,000 inches of piping and assembly of 800 tn of equipment, some as singular as an 80 m high distillation tower (the largest at the refinery) which is 4 m in diameter.

Cepsa

Intecsa
C/ Asturies, 8 - 10 · 08830 Sant Boi de Llobregat · Situation map
Tel. 935 521 400
C/ Castelló, 23 · 28001 Madrid · Situation map
Tel. 917 819 170
© Abantia 2008 - 2012 · All rights reserved