Abantia. Leaders in commitment


Tools


Home > The Group > Affiliated companies and joint ventures > Main affiliated companies


The Group

Main affiliated companies

Waste treatment and energy

TRACJUSA

Activity: Physicochemical treatment of liquid manure and cogeneration.

Participation: 6,50%

Investment: 18.36 M€

Main characteristics:

  • Power: 16.3MW
  • tonnes/year: 100,000
  • Commissioning: 2005

VAG

Activity: Physicochemical treatment of liquid manure and cogeneration.

Participation: 24,58%

Investment: 18.00 M€

Main characteristics:

  • Power: 16,4 MW
  • tonnes/year: 110.000
  • Commissioning: 2006

SAVA

Activity: Physicochemical treatment of liquid manure and cogeneration.

Participation: 41,50%

Investment: 27,05 M€

Main characteristics:

  • Power: 15,5 MW
  • tonnes/year: 100.000
  • Commissioning: 2009

Campillos

Activity: Photovoltaic solar plant

Participation: 100%

Investment: 13,97 M€

Main characteristics:

  • Power: 1,8 MW
  • Commissioning: 2008

Solmir, SL

Activity: Photovoltaic solar plant

Participation: 50%

Investment: 7,40 M€

Main characteristics:

  • Power: 1 MW
  • Commissioning: 2008

Alcardeteña

Activity: Photovoltaic solar plant

Participation: 34%

Investment: 16,70M€

Main characteristics:

  • Power: 2 MW
  • Commissioning: 2008

Solfuture

Activity: Photovoltaic solar plant

Participation: 50%

Investment: 13,36M€

Main characteristics:

  • Power: 1,6 MW
  • Commissioning: 2008

Contracts for public administrations

Inapreu

Activity: Company responsible for the construction, maintenance and operation of the courts of Olot, Cerdanyola del Vallès and Santa Coloma de Gramenet for the Justice Department of the Catalan Government.

Shareholding: 50%

Investment: 28.366.295 €

Main characteristics:

  • Olot courts: 3,376 m2
  • Cerdanyola del Vallès courts: 8,287 m2
  • Santa Coloma de Gramenet courts: 7,559 m2

Leisure facilities

Faunia

Activity: A nature and environmental theme park.
Abantia joined the team responsible for the management and design of the project, as well as the construction and engineering of the installations.

Participation: 5,14%

Main characteristics:

  • The area is divided into twelve themed areas. It has a theatre, forum, cinema, shops and restaurants.

Skydair Empuriabrava

Activity: Construction and operation of a closed wind tunnel for the simulation of free-fall parachuting.

Participation: 42%

Main characteristics:

  • The tunnel is designed in a closed circuit, has a flight chamber with a diameter of 5 metres and reaches air speeds of over 250km/h

Site information

Contact with us

Torre Allianz

Headquarters

Barcelona

C/ Asturies, 8 - 10 · 08830 Sant Boi de Llobregat · Situation map
Tel. 935 521 400

Madrid

C/ Castelló, 23 · 28001 Madrid · Situation map
Tel. 917 819 170

© Abantia 2008 - 2012 · All rights reserved